findapolt.blogg.se

Otis oregon fire map
Otis oregon fire map









otis oregon fire map

While not anticipated, some buildings may briefly lose power when the switch occurs, if a portion of the system does not perform as expected.Īt 7:45 am, Feeder 1 will be de-energized.

OTIS OREGON FIRE MAP GENERATOR

This year’s Island Mode event will take place on Wednesday, September 14, 2022, at 7:35 am.Īt 7:35 am, the entire campus will shift from the primary EWEB power source to the backup generator system at the Central Power Station, also known as “Island Mode”. To best ensure this system operates as designed when needed, the Utility and Energy plant now exercises this system annually. In the event our campus service from the local EWEB electrical grid is interrupted, the UO Utility and Energy plant is capable of providing the campus with electricity (called Island Mode). We are writing to remind you of the upcoming annual planned power outage on Wednesday, September 14 th, 2022. Please report any issues caused by the outage, including IT, to the CPFM Work Control Center at 54, or by entering a service request on the UO call log. Utilities & Energy has switched from island mode back to the normal power configuration as planned. Posted in Access, Elevators, Lifts 9/14/22 Planned Power Outage (blue)Ĭontact: Martina Oxoby, CPFM Owner’s Representative, 54 The corridor width will be narrowed, but cart access to the Zebrafish Facility will be maintained. December 19 – February 6, 2023: The north side of the hallway ramp will be under containment.D ecember 1 – 16, 2022: The south side of the hallway ramp will be under containment.NovemDecem– March 13 31, 2023: Scaffolding will be in place over head of the hallway ramp, access will be maintained between Huestis and Lokey.

otis oregon fire map

  • September 28 – November 29, 2022: The gantry crane area will be blocked off and the hallway ramp will be narrowed as the Huestis elevator is decommissioned and removed.
  • Scope: As part of the demolition and seismic work associated with the Huestis Hall Renovation project, attached is a map of upcoming work activities that affect access between the basement of Huestis Hall and Lokey Labs. Revised Date: November 30, 2022 Decem– March 13 31, 2023: Scaffolding will be in place over head of the hallway ramp, access will be maintained between Huestis and Lokey.īuilding(s) or Area(s) Affected: Elevators, Hallway & Lifts The scaffolding will remain in place until March 31, 2023.











    Otis oregon fire map